Data driven modeling and simulation for TBM reliability analysis in tunnels
Tunnel-induced damage has become one of the most critical problems in the world, due to the rapid growth of urban metro systems. Tunnel boring machines (TBMs) have become increasingly common in recent years. To perform single objective optimization and multi-objective optimization for minimizing tun...
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | Final Year Project |
Language: | English |
Published: |
Nanyang Technological University
2021
|
Subjects: | |
Online Access: | https://hdl.handle.net/10356/150453 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
id |
sg-ntu-dr.10356-150453 |
---|---|
record_format |
dspace |
spelling |
sg-ntu-dr.10356-1504532021-05-27T07:45:57Z Data driven modeling and simulation for TBM reliability analysis in tunnels Yeong, She Chan Zhang Limao School of Civil and Environmental Engineering limao.zhang@ntu.edu.sg Engineering::Civil engineering Tunnel-induced damage has become one of the most critical problems in the world, due to the rapid growth of urban metro systems. Tunnel boring machines (TBMs) have become increasingly common in recent years. To perform single objective optimization and multi-objective optimization for minimizing tunnel-induced damages under uncertainty, a hybrid approach combining fuzzy cognitive map (FCM) with real-coded genetic algorithm, and FCM with non-dominant sorting genetic algorithm-II (NSGA-II) is proposed. Using RCGA on a data-driven modelling approach, FCMs are learned from historical datasets. There are 16 identified concept nodes and 2 key objectives, building tilt rate and accumulative settlement, are used for optimization and to find the optimal solutions among them. To assess the applicability and efficacy of the suggested strategy, in this study, TBM parameters are extensively explored. Results shows that (1) grouting volume have the highest influence on both building tilt rate and accumulative settlement. (2) A combination of concept nodes will give a better optimization result. (3) Multi-objective optimization with a 13.01% improvement is better overall to achieve the optimal solutions than single objective optimization with 6.66% improvement. The established method is effective that it is capable of not only predicting the severity of tunnel-induced losses, but also allows stakeholders to minimize them when multiple objectives are optimized at the same time. Bachelor of Engineering (Civil) 2021-05-27T07:45:57Z 2021-05-27T07:45:57Z 2021 Final Year Project (FYP) Yeong, S. C. (2021). Data driven modeling and simulation for TBM reliability analysis in tunnels. Final Year Project (FYP), Nanyang Technological University, Singapore. https://hdl.handle.net/10356/150453 https://hdl.handle.net/10356/150453 en CT-03 application/pdf Nanyang Technological University |
institution |
Nanyang Technological University |
building |
NTU Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NTU Library |
collection |
DR-NTU |
language |
English |
topic |
Engineering::Civil engineering |
spellingShingle |
Engineering::Civil engineering Yeong, She Chan Data driven modeling and simulation for TBM reliability analysis in tunnels |
description |
Tunnel-induced damage has become one of the most critical problems in the world, due to the rapid growth of urban metro systems. Tunnel boring machines (TBMs) have become increasingly common in recent years. To perform single objective optimization and multi-objective optimization for minimizing tunnel-induced damages under uncertainty, a hybrid approach combining fuzzy cognitive map (FCM) with real-coded genetic algorithm, and FCM with non-dominant sorting genetic algorithm-II (NSGA-II) is proposed. Using RCGA on a data-driven modelling approach, FCMs are learned from historical datasets. There are 16 identified concept nodes and 2 key objectives, building tilt rate and accumulative settlement, are used for optimization and to find the optimal solutions among them. To assess the applicability and efficacy of the suggested strategy, in this study, TBM parameters are extensively explored. Results shows that (1) grouting volume have the highest influence on both building tilt rate and accumulative settlement. (2) A combination of concept nodes will give a better optimization result. (3) Multi-objective optimization with a 13.01% improvement is better overall to achieve the optimal solutions than single objective optimization with 6.66% improvement. The established method is effective that it is capable of not only predicting the severity of tunnel-induced losses, but also allows stakeholders to minimize them when multiple objectives are optimized at the same time. |
author2 |
Zhang Limao |
author_facet |
Zhang Limao Yeong, She Chan |
format |
Final Year Project |
author |
Yeong, She Chan |
author_sort |
Yeong, She Chan |
title |
Data driven modeling and simulation for TBM reliability analysis in tunnels |
title_short |
Data driven modeling and simulation for TBM reliability analysis in tunnels |
title_full |
Data driven modeling and simulation for TBM reliability analysis in tunnels |
title_fullStr |
Data driven modeling and simulation for TBM reliability analysis in tunnels |
title_full_unstemmed |
Data driven modeling and simulation for TBM reliability analysis in tunnels |
title_sort |
data driven modeling and simulation for tbm reliability analysis in tunnels |
publisher |
Nanyang Technological University |
publishDate |
2021 |
url |
https://hdl.handle.net/10356/150453 |
_version_ |
1701270614321397760 |