Real-time water quality measurements and predictions for the Marina Catchment
The objectives of the project are to establish a relationship between real-time and lab-measured data and using this correlation to predict real time water quality in the Marina Catchment. The YSI was used in monitoring real-time water quality while the auto-sampler triggered during a heavy storm co...
Saved in:
主要作者: | Lee, Maureen Seok Mui. |
---|---|
其他作者: | Chua Hock Chye Lloyd |
格式: | Final Year Project |
語言: | English |
出版: |
2009
|
主題: | |
在線閱讀: | http://hdl.handle.net/10356/15839 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
機構: | Nanyang Technological University |
語言: | English |
相似書籍
-
Real time water quality measurements and predictions for the Marina Catchments
由: Chen, Min.
出版: (2009) -
Study on sediment discharge in the Marina Bay catchment
由: Tan, Michelle Mixue.
出版: (2009) -
Study of sediment discharge in the Marina Bay catchment
由: Yeo, Alex Soon Tat.
出版: (2009) -
A Real-Time Optimal Control Approach for Water Quality and Quantity Management: Marina Reservoir Case Study
由: ALBERT GOEDBLOED
出版: (2014) -
Occurrence, fate, and fluxes of perfluorochemicals (PFCs) in an urban catchment : Marina reservoir, Singapore
由: Nguyen, Viet Tung, et al.
出版: (2013)