Automated resource reallocation to overcome construction logistics disruptions

The building and construction industry consists of multiple stakeholders and regularly faces resource disruptions that result in productivity loss and project delays. To mitigate the effects caused by construction logistics disruptions, there is a need to boost construction resilience by establishin...

Full description

Saved in:
Bibliographic Details
Main Author: Khoo, Natasha Shu Yein
Other Authors: Wang Zhiwei
Format: Final Year Project
Language:English
Published: Nanyang Technological University 2022
Subjects:
Online Access:https://hdl.handle.net/10356/158553
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
Description
Summary:The building and construction industry consists of multiple stakeholders and regularly faces resource disruptions that result in productivity loss and project delays. To mitigate the effects caused by construction logistics disruptions, there is a need to boost construction resilience by establishing flexible resource allocation. The availability of these resources, such as manpower, equipment, and material, is crucial towards construction projects’ success and is emphasized in this project. This project focuses on developing a resource allocation and reallocation system that automatically generates remedies to key stakeholders during disruptions. The system will be utilized by a construction contractor who has multiple ongoing projects with varying deadlines and logistics schedules to provide solutions on the reallocation of site resources due to manpower, equipment, and material-related disruptions.