Impacts of large-scale wind farms on power system operation

The aim of this project is to develop a simulation technique that can assess the impact of large scale wind power on the operations from the cost, reliability and environmental perspectives. The simulation will be using IEEE reliability test system data for the 26 generating units and wind farm w...

Full description

Saved in:
Bibliographic Details
Main Author: Wee, Xi Jie.
Other Authors: Gooi Hoay Beng
Format: Final Year Project
Language:English
Published: 2009
Subjects:
Online Access:http://hdl.handle.net/10356/16791
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-16791
record_format dspace
spelling sg-ntu-dr.10356-167912023-07-07T16:36:08Z Impacts of large-scale wind farms on power system operation Wee, Xi Jie. Gooi Hoay Beng School of Electrical and Electronic Engineering DRNTU::Engineering::Electrical and electronic engineering::Electric power::Auxiliaries, applications and electric industries The aim of this project is to develop a simulation technique that can assess the impact of large scale wind power on the operations from the cost, reliability and environmental perspectives. The simulation will be using IEEE reliability test system data for the 26 generating units and wind farm will act as generating unit 27. Using the unit commitment and economic dispatch tool allows for frequent revisions of conventional generation unit schedules based on forecasts wind energy output. Wind forecast error will be added into the simulation to examine how forecast errors will impact the studies. The studies will examine how the wind speeds will affect the wind power generation. With the wind power generation price set at zero, the studies examine how the wind power generation will help to reduce the conventional generation and the cost saving. Comparison of without and with wind generation using unit commitment will be studied to see how it plan the scheduling in an economic way. Constrains such as system power balance constraints, system spinning reserve constraints, ramp rate constraints, unit minimum up / down time constraints, unit generation constraints and load constraints can be incorporated in the unit commitment problem. LaGrange relaxation solution will be used to solve the problem. With the increasing of wind generation, we get to see how it will affect the spinning reserves. We examine how the without and with wind generation at different levels will affect the total operation costs, the total profits. How the increases of the wind speeds will affect the profits. Bachelor of Engineering 2009-05-28T04:25:54Z 2009-05-28T04:25:54Z 2009 2009 Final Year Project (FYP) http://hdl.handle.net/10356/16791 en Nanyang Technological University 69 p. application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
language English
topic DRNTU::Engineering::Electrical and electronic engineering::Electric power::Auxiliaries, applications and electric industries
spellingShingle DRNTU::Engineering::Electrical and electronic engineering::Electric power::Auxiliaries, applications and electric industries
Wee, Xi Jie.
Impacts of large-scale wind farms on power system operation
description The aim of this project is to develop a simulation technique that can assess the impact of large scale wind power on the operations from the cost, reliability and environmental perspectives. The simulation will be using IEEE reliability test system data for the 26 generating units and wind farm will act as generating unit 27. Using the unit commitment and economic dispatch tool allows for frequent revisions of conventional generation unit schedules based on forecasts wind energy output. Wind forecast error will be added into the simulation to examine how forecast errors will impact the studies. The studies will examine how the wind speeds will affect the wind power generation. With the wind power generation price set at zero, the studies examine how the wind power generation will help to reduce the conventional generation and the cost saving. Comparison of without and with wind generation using unit commitment will be studied to see how it plan the scheduling in an economic way. Constrains such as system power balance constraints, system spinning reserve constraints, ramp rate constraints, unit minimum up / down time constraints, unit generation constraints and load constraints can be incorporated in the unit commitment problem. LaGrange relaxation solution will be used to solve the problem. With the increasing of wind generation, we get to see how it will affect the spinning reserves. We examine how the without and with wind generation at different levels will affect the total operation costs, the total profits. How the increases of the wind speeds will affect the profits.
author2 Gooi Hoay Beng
author_facet Gooi Hoay Beng
Wee, Xi Jie.
format Final Year Project
author Wee, Xi Jie.
author_sort Wee, Xi Jie.
title Impacts of large-scale wind farms on power system operation
title_short Impacts of large-scale wind farms on power system operation
title_full Impacts of large-scale wind farms on power system operation
title_fullStr Impacts of large-scale wind farms on power system operation
title_full_unstemmed Impacts of large-scale wind farms on power system operation
title_sort impacts of large-scale wind farms on power system operation
publishDate 2009
url http://hdl.handle.net/10356/16791
_version_ 1772828135727824896