Project management for design and build residential projects

This report describes a study on project management for design and build residential projects. Two projects awarded under the JCT form of design and build contract and five projects awarded under the traditional form of SIA lump sum contract were used as case studies. It is claimed that fast-track c...

Full description

Saved in:
Bibliographic Details
Main Author: Low, McDonald Hoong Chiong.
Other Authors: Yip, Woon Kwong
Format: Theses and Dissertations
Language:English
Published: 2009
Subjects:
Online Access:http://hdl.handle.net/10356/19479
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
Description
Summary:This report describes a study on project management for design and build residential projects. Two projects awarded under the JCT form of design and build contract and five projects awarded under the traditional form of SIA lump sum contract were used as case studies. It is claimed that fast-track construction, acceptable quality and cost competitiveness are achievable in design and build residential projects. A comparison is made between projects awarded under the two different form of contracts.