Project management for design and build residential projects

This report describes a study on project management for design and build residential projects. Two projects awarded under the JCT form of design and build contract and five projects awarded under the traditional form of SIA lump sum contract were used as case studies. It is claimed that fast-track c...

Full description

Saved in:
Bibliographic Details
Main Author: Low, McDonald Hoong Chiong.
Other Authors: Yip, Woon Kwong
Format: Theses and Dissertations
Language:English
Published: 2009
Subjects:
Online Access:http://hdl.handle.net/10356/19479
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-19479
record_format dspace
spelling sg-ntu-dr.10356-194792020-09-26T21:20:35Z Project management for design and build residential projects Low, McDonald Hoong Chiong. Yip, Woon Kwong Centre for Advanced Construction Studies DRNTU::Engineering::Civil engineering::Construction management This report describes a study on project management for design and build residential projects. Two projects awarded under the JCT form of design and build contract and five projects awarded under the traditional form of SIA lump sum contract were used as case studies. It is claimed that fast-track construction, acceptable quality and cost competitiveness are achievable in design and build residential projects. A comparison is made between projects awarded under the two different form of contracts. Master of Science (International Construction Management) 2009-12-11T09:19:10Z 2009-12-11T09:19:10Z 1996 1996 Thesis http://hdl.handle.net/10356/19479 en NANYANG TECHNOLOGICAL UNIVERSITY 174 p. application/pdf
institution Nanyang Technological University
building NTU Library
country Singapore
collection DR-NTU
language English
topic DRNTU::Engineering::Civil engineering::Construction management
spellingShingle DRNTU::Engineering::Civil engineering::Construction management
Low, McDonald Hoong Chiong.
Project management for design and build residential projects
description This report describes a study on project management for design and build residential projects. Two projects awarded under the JCT form of design and build contract and five projects awarded under the traditional form of SIA lump sum contract were used as case studies. It is claimed that fast-track construction, acceptable quality and cost competitiveness are achievable in design and build residential projects. A comparison is made between projects awarded under the two different form of contracts.
author2 Yip, Woon Kwong
author_facet Yip, Woon Kwong
Low, McDonald Hoong Chiong.
format Theses and Dissertations
author Low, McDonald Hoong Chiong.
author_sort Low, McDonald Hoong Chiong.
title Project management for design and build residential projects
title_short Project management for design and build residential projects
title_full Project management for design and build residential projects
title_fullStr Project management for design and build residential projects
title_full_unstemmed Project management for design and build residential projects
title_sort project management for design and build residential projects
publishDate 2009
url http://hdl.handle.net/10356/19479
_version_ 1681058932568621056