Computer-based methods for cost estimation of underground electrical cable installation in Singapore

This thesis attempts to quantify the productivity aspect of conduits laying works under the PUB's power cable installation program. The objectives are two fold. Firstly, to study the environmental factors affecting the productivity of the works and quantify them formally and, secondly, to devel...

Full description

Saved in:
Bibliographic Details
Main Authors: Ho, Teck Hong., Woon, Hin Juan.
Other Authors: Lee, Jin
Format: Theses and Dissertations
Language:English
Published: 2009
Subjects:
Online Access:http://hdl.handle.net/10356/19497
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-19497
record_format dspace
spelling sg-ntu-dr.10356-194972020-09-26T21:19:49Z Computer-based methods for cost estimation of underground electrical cable installation in Singapore Ho, Teck Hong. Woon, Hin Juan. Lee, Jin Centre for Advanced Construction Studies DRNTU::Engineering::Civil engineering::Construction management This thesis attempts to quantify the productivity aspect of conduits laying works under the PUB's power cable installation program. The objectives are two fold. Firstly, to study the environmental factors affecting the productivity of the works and quantify them formally and, secondly, to develop computer models for estimating the cost of such works. Master of Science (International Construction Management) 2009-12-11T09:20:06Z 2009-12-11T09:20:06Z 1995 1995 Thesis http://hdl.handle.net/10356/19497 en NANYANG TECHNOLOGICAL UNIVERSITY 101 p. application/pdf
institution Nanyang Technological University
building NTU Library
country Singapore
collection DR-NTU
language English
topic DRNTU::Engineering::Civil engineering::Construction management
spellingShingle DRNTU::Engineering::Civil engineering::Construction management
Ho, Teck Hong.
Woon, Hin Juan.
Computer-based methods for cost estimation of underground electrical cable installation in Singapore
description This thesis attempts to quantify the productivity aspect of conduits laying works under the PUB's power cable installation program. The objectives are two fold. Firstly, to study the environmental factors affecting the productivity of the works and quantify them formally and, secondly, to develop computer models for estimating the cost of such works.
author2 Lee, Jin
author_facet Lee, Jin
Ho, Teck Hong.
Woon, Hin Juan.
format Theses and Dissertations
author Ho, Teck Hong.
Woon, Hin Juan.
author_sort Ho, Teck Hong.
title Computer-based methods for cost estimation of underground electrical cable installation in Singapore
title_short Computer-based methods for cost estimation of underground electrical cable installation in Singapore
title_full Computer-based methods for cost estimation of underground electrical cable installation in Singapore
title_fullStr Computer-based methods for cost estimation of underground electrical cable installation in Singapore
title_full_unstemmed Computer-based methods for cost estimation of underground electrical cable installation in Singapore
title_sort computer-based methods for cost estimation of underground electrical cable installation in singapore
publishDate 2009
url http://hdl.handle.net/10356/19497
_version_ 1681058567770079232