Computer-based methods for cost estimation of underground electrical cable installation in Singapore
This thesis attempts to quantify the productivity aspect of conduits laying works under the PUB's power cable installation program. The objectives are two fold. Firstly, to study the environmental factors affecting the productivity of the works and quantify them formally and, secondly, to devel...
Saved in:
Main Authors: | Ho, Teck Hong., Woon, Hin Juan. |
---|---|
Other Authors: | Lee, Jin |
Format: | Theses and Dissertations |
Language: | English |
Published: |
2009
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/19497 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
Time/cost performance ratio modelling for estimation and project evaluation
by: Goh, Ngan Hong.
Published: (2009) -
Optimal Sensor Placement for Accelerometer in Single-Pylon Cable-Stayed Bridge
by: Aminullah, Akhmad, et al.
Published: (2022) -
Construction productivity of precast concrete installation on site
by: Ting, Darren Weiwen.
Published: (2012) -
Variability and accuracy of contractors' cost estimates
by: Khor, Yew Chai., et al.
Published: (2009) -
Management of an underground MRT station construction
by: Soh, Kin Meng.
Published: (2008)