Computer-based methods for cost estimation of underground electrical cable installation in Singapore
This thesis attempts to quantify the productivity aspect of conduits laying works under the PUB's power cable installation program. The objectives are two fold. Firstly, to study the environmental factors affecting the productivity of the works and quantify them formally and, secondly, to devel...
Saved in:
Main Authors: | Ho, Teck Hong., Woon, Hin Juan. |
---|---|
其他作者: | Lee, Jin |
格式: | Theses and Dissertations |
語言: | English |
出版: |
2009
|
主題: | |
在線閱讀: | http://hdl.handle.net/10356/19497 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
相似書籍
-
Time/cost performance ratio modelling for estimation and project evaluation
由: Goh, Ngan Hong.
出版: (2009) -
Optimal Sensor Placement for Accelerometer in Single-Pylon Cable-Stayed Bridge
由: Aminullah, Akhmad, et al.
出版: (2022) -
Construction productivity of precast concrete installation on site
由: Ting, Darren Weiwen.
出版: (2012) -
Variability and accuracy of contractors' cost estimates
由: Khor, Yew Chai., et al.
出版: (2009) -
Management of an underground MRT station construction
由: Soh, Kin Meng.
出版: (2008)