Time/cost performance ratio modelling for estimation and project evaluation
The objective of this study is to develop a theoretical background for defining and measuring performance of construction projects in relation to both time and cost effectiveness and to investigate and analyze the contract performance with respect to public institutional building and road projects i...
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | Theses and Dissertations |
Language: | English |
Published: |
2009
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/19528 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
id |
sg-ntu-dr.10356-19528 |
---|---|
record_format |
dspace |
spelling |
sg-ntu-dr.10356-195282020-09-26T21:22:37Z Time/cost performance ratio modelling for estimation and project evaluation Goh, Ngan Hong. V Shanmuganayagam Centre for Advanced Construction Studies DRNTU::Engineering::Civil engineering::Construction management The objective of this study is to develop a theoretical background for defining and measuring performance of construction projects in relation to both time and cost effectiveness and to investigate and analyze the contract performance with respect to public institutional building and road projects in Singapore in the last ten years (1981 to 1990). It also attempts to formulate methods by which the results of the study can be used for improving performance of similar building and road projects in future by setting realistic time and cost targets. Master of Science (International Construction Management) 2009-12-14T05:53:17Z 2009-12-14T05:53:17Z 1993 1993 Thesis http://hdl.handle.net/10356/19528 en NANYANG TECHNOLOGICAL UNIVERSITY 121 p. application/pdf |
institution |
Nanyang Technological University |
building |
NTU Library |
country |
Singapore |
collection |
DR-NTU |
language |
English |
topic |
DRNTU::Engineering::Civil engineering::Construction management |
spellingShingle |
DRNTU::Engineering::Civil engineering::Construction management Goh, Ngan Hong. Time/cost performance ratio modelling for estimation and project evaluation |
description |
The objective of this study is to develop a theoretical background for defining and measuring performance of construction projects in relation to both time and cost effectiveness and to investigate and analyze the contract performance with respect to public institutional building and road projects in Singapore in the last ten years (1981 to 1990). It also attempts to formulate methods by which the results of the study can be used for improving performance of similar building and road projects in future by setting realistic time and cost targets. |
author2 |
V Shanmuganayagam |
author_facet |
V Shanmuganayagam Goh, Ngan Hong. |
format |
Theses and Dissertations |
author |
Goh, Ngan Hong. |
author_sort |
Goh, Ngan Hong. |
title |
Time/cost performance ratio modelling for estimation and project evaluation |
title_short |
Time/cost performance ratio modelling for estimation and project evaluation |
title_full |
Time/cost performance ratio modelling for estimation and project evaluation |
title_fullStr |
Time/cost performance ratio modelling for estimation and project evaluation |
title_full_unstemmed |
Time/cost performance ratio modelling for estimation and project evaluation |
title_sort |
time/cost performance ratio modelling for estimation and project evaluation |
publishDate |
2009 |
url |
http://hdl.handle.net/10356/19528 |
_version_ |
1681059771525890048 |