Automation of 3" drive boardmate station
The manual assembly process at 3" Drive Boardmate station consists of loading of drive HDA, Insulator, PCBA and Shield, into a fixture, and fastening of five screws. Unloading of the fastened drive and Visual Inspection, are also done at the same station. The total cycle time taken for this sta...
Saved in:
Main Author: | Abusalih Sheikallaudeen Mydeen |
---|---|
Other Authors: | Gan, Jacob Gah Kok |
Format: | Theses and Dissertations |
Language: | English |
Published: |
2009
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/19922 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
Automated viper 150 low cost basic test station
by: Chee, Vincent Weng Keong.
Published: (2009) -
IoT : development of a home automation system 3
by: Tan, Yong Rui
Published: (2019) -
Investigation into an automated container yard
by: Pang, Andrew Li Jian
Published: (2009) -
Design and development of an automated labelling machine
by: Foo, Dunxiang.
Published: (2009) -
Honeycomb panel insert potting automation
by: Tan, Noel Yi Wei
Published: (2018)