A knowledge-based job scheduler

Two main resources are involved in a calibration process, they are calibration officer and reference equipment. In order to optimise and co-ordinate the use of these resources, scheduling are required. At the moment, these resources are manually scheduled by the process planner. The disadvantages ar...

Full description

Saved in:
Bibliographic Details
Main Author: Ho, Yik Hwee.
Other Authors: Seow, Yit Yuee
Format: Theses and Dissertations
Language:English
Published: 2009
Subjects:
Online Access:http://hdl.handle.net/10356/19941
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-19941
record_format dspace
spelling sg-ntu-dr.10356-199412023-03-11T16:55:21Z A knowledge-based job scheduler Ho, Yik Hwee. Seow, Yit Yuee School of Mechanical and Production Engineering DRNTU::Engineering::Industrial engineering::Managerial control systems Two main resources are involved in a calibration process, they are calibration officer and reference equipment. In order to optimise and co-ordinate the use of these resources, scheduling are required. At the moment, these resources are manually scheduled by the process planner. The disadvantages are time consuming, tedious, heavy reliance on experience and memory of the process planner, difficulty in maintaining consistency in editing practices and sub-optimisation of the use of resources. Master of Science (Computer Integrated Manufacturing) 2009-12-14T07:52:24Z 2009-12-14T07:52:24Z 1997 1997 Thesis http://hdl.handle.net/10356/19941 en NANYANG TECHNOLOGICAL UNIVERSITY 195 p. application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
language English
topic DRNTU::Engineering::Industrial engineering::Managerial control systems
spellingShingle DRNTU::Engineering::Industrial engineering::Managerial control systems
Ho, Yik Hwee.
A knowledge-based job scheduler
description Two main resources are involved in a calibration process, they are calibration officer and reference equipment. In order to optimise and co-ordinate the use of these resources, scheduling are required. At the moment, these resources are manually scheduled by the process planner. The disadvantages are time consuming, tedious, heavy reliance on experience and memory of the process planner, difficulty in maintaining consistency in editing practices and sub-optimisation of the use of resources.
author2 Seow, Yit Yuee
author_facet Seow, Yit Yuee
Ho, Yik Hwee.
format Theses and Dissertations
author Ho, Yik Hwee.
author_sort Ho, Yik Hwee.
title A knowledge-based job scheduler
title_short A knowledge-based job scheduler
title_full A knowledge-based job scheduler
title_fullStr A knowledge-based job scheduler
title_full_unstemmed A knowledge-based job scheduler
title_sort knowledge-based job scheduler
publishDate 2009
url http://hdl.handle.net/10356/19941
_version_ 1761781512123973632