A knowledge-based job scheduler
Two main resources are involved in a calibration process, they are calibration officer and reference equipment. In order to optimise and co-ordinate the use of these resources, scheduling are required. At the moment, these resources are manually scheduled by the process planner. The disadvantages ar...
Saved in:
Main Author: | Ho, Yik Hwee. |
---|---|
Other Authors: | Seow, Yit Yuee |
Format: | Theses and Dissertations |
Language: | English |
Published: |
2009
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/19941 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
Designing and comparing schedule-based manufacturing with MRPII
by: Tan, Choon Siang.
Published: (2010) -
Optimization using a spreadsheet program
by: Tan, Hwee Sien.
Published: (2011) -
Automation based software development methodology for product service system enabler device
by: James Joseph
Published: (2010) -
Business process reengineering in a design and development environment
by: Chiang, Kum Chuen.
Published: (2008) -
Modelling of roster : optimization of DEM roster at SGH
by: Yap, Wei Qing.
Published: (2009)