Using modeling and simulation for scheduling of test cell in an electronic company
The primary objective of scheduling is to enable a company to deliver quality parts to the customer on time. However, there are many conflicting factors, both internal and external, that affect the drive to reach this objective. It is almost impossible to deliver quality parts to all the customers o...
محفوظ في:
المؤلف الرئيسي: | Cheng, Yau Tong. |
---|---|
مؤلفون آخرون: | Lee, Stephen Siang Guan |
التنسيق: | Theses and Dissertations |
اللغة: | English |
منشور في: |
2009
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10356/19995 |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
المؤسسة: | Nanyang Technological University |
اللغة: | English |
مواد مشابهة
-
Foundry production scheduling by Adexa in an oilfield service company
بواسطة: Wang, Xiaojun
منشور في: (2014) -
The production scheduling using economic lot sizing approach at a pharmaceutical company.
بواسطة: Sumit, Gupta.
منشور في: (2008) -
Trend of Singapre electronics manufacturing : company of the future
بواسطة: Wong, Yeow Kong.
منشور في: (2008) -
A simulation-based study of scheduling policies to improve the factory performance
بواسطة: Li, Meng
منشور في: (2014) -
Multi-objective scheduling in PCB assembly manufacturing : discrete event simulation approach
بواسطة: Zuo, Jie
منشور في: (2014)