Using modeling and simulation for scheduling of test cell in an electronic company
The primary objective of scheduling is to enable a company to deliver quality parts to the customer on time. However, there are many conflicting factors, both internal and external, that affect the drive to reach this objective. It is almost impossible to deliver quality parts to all the customers o...
Saved in:
主要作者: | Cheng, Yau Tong. |
---|---|
其他作者: | Lee, Stephen Siang Guan |
格式: | Theses and Dissertations |
語言: | English |
出版: |
2009
|
主題: | |
在線閱讀: | http://hdl.handle.net/10356/19995 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
機構: | Nanyang Technological University |
語言: | English |
相似書籍
-
Foundry production scheduling by Adexa in an oilfield service company
由: Wang, Xiaojun
出版: (2014) -
The production scheduling using economic lot sizing approach at a pharmaceutical company.
由: Sumit, Gupta.
出版: (2008) -
Trend of Singapre electronics manufacturing : company of the future
由: Wong, Yeow Kong.
出版: (2008) -
A simulation-based study of scheduling policies to improve the factory performance
由: Li, Meng
出版: (2014) -
Multi-objective scheduling in PCB assembly manufacturing : discrete event simulation approach
由: Zuo, Jie
出版: (2014)