Plant maintenance system
This report is divided into four sections, “Introduction”, “Project Plan”, “Proposed Solution”, and “Conclusion”. “Project Plan” and “Proposed Solution” form the main bulk of the report. The “Project Plan” gives a brief overview of the company background and its existing problems. This section al...
Saved in:
Main Authors: | , , |
---|---|
其他作者: | |
格式: | Final Year Project |
語言: | English |
出版: |
2010
|
主題: | |
在線閱讀: | http://hdl.handle.net/10356/21212 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
總結: | This report is divided into four sections, “Introduction”, “Project Plan”, “Proposed Solution”,
and “Conclusion”. “Project Plan” and “Proposed Solution” form the main bulk of the report.
The “Project Plan” gives a brief overview of the company background and its existing
problems. This section also contains other information such as the scope, tasks and criteria of success, etc. of the project.
The “Proposed Solution” section goes through the steps that the group have undergone in order to arrive at the proposed solution. This section includes three steps of analysis namely the problem, requirements and feasibility analysis, which will be followed by the logical design
and physical design of the proposed system.
Finally, this report will conclude with an evaluation of the group’s recommendations and a summary of how the information system can add value to KB Associates Pte Ltd. |
---|