Overall benefit-duration optimization and its genetic algorithim application in construction project scheduling

In this research, a new concept of Overall Benefit-Duration Optimization (OBDO) is proposed with objective function to maximize overall benefit of a construction project in scheduling process. An integrated solution model is developed by applying genetic algorithm and named as Genetic Algorithm Over...

Full description

Saved in:
Bibliographic Details
Main Author: Pan, Heng
Other Authors: Ting Seng Kiong
Format: Theses and Dissertations
Language:English
Published: 2010
Subjects:
Online Access:https://hdl.handle.net/10356/41774
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-41774
record_format dspace
spelling sg-ntu-dr.10356-417742023-03-03T19:21:30Z Overall benefit-duration optimization and its genetic algorithim application in construction project scheduling Pan, Heng Ting Seng Kiong School of Civil and Environmental Engineering DRNTU::Engineering::Civil engineering::Construction management In this research, a new concept of Overall Benefit-Duration Optimization (OBDO) is proposed with objective function to maximize overall benefit of a construction project in scheduling process. An integrated solution model is developed by applying genetic algorithm and named as Genetic Algorithm Overall Benefit-Duration Optimization (GAOBDO). In order to facilitate practical usage, GAOBDO is coded in VBA (Visual Basic for Application) macro program in Microsoft Project 2003 as an application platform, which automates data input, model structure and outcome interfaces. Given a normally-planned construction project with minimum cost, under a prerequisite that network compression-incurred opportunity income exceeds cost increment, it is lucrative to compress the project network to a desired duration where overall benefit, which refers to the difference between opportunity income and cost increment, is maximized. This problem is referred to as Overall Benefit-Duration Optimization (OBDO). Unlike time-cost trade-off problems that minimize cost, OBDO is a new scheduling optimization scheme for maximum overall benefit and prone to interests of a project owner. In addition, as a win-win solution, incentive fee is introduced in OBDO as an economic reward to contractor. As a combinatorial optimization problem, OBDO is complex and requires iterative selections of task crashing in network compression. Considering the number of possible iterations involved in this optimization process, optimal OBDO solution is difficult and time-consuming. Integrating extensive searching power of GA in combinatorial optimization problems, OBDO is modeled to maximize overall benefit and accounts for network compression-incurred influences to profitability of a construction project. After experimenting on various cases drawn from journal papers and real practice, 3 typical case studies of various-sized project networks are applied to demonstrate feasibility of OBDO concept and practicability of GAOBDO model. Doctor of Philosophy (CEE) 2010-08-12T01:25:17Z 2010-08-12T01:25:17Z 2008 2008 Thesis Pan, H. (2008). Overall benefit-duration optimization and its genetic algorithim application in construction project scheduling. Doctoral thesis, Nanyang Technological University, Singapore. https://hdl.handle.net/10356/41774 10.32657/10356/41774 en 159 p. application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
language English
topic DRNTU::Engineering::Civil engineering::Construction management
spellingShingle DRNTU::Engineering::Civil engineering::Construction management
Pan, Heng
Overall benefit-duration optimization and its genetic algorithim application in construction project scheduling
description In this research, a new concept of Overall Benefit-Duration Optimization (OBDO) is proposed with objective function to maximize overall benefit of a construction project in scheduling process. An integrated solution model is developed by applying genetic algorithm and named as Genetic Algorithm Overall Benefit-Duration Optimization (GAOBDO). In order to facilitate practical usage, GAOBDO is coded in VBA (Visual Basic for Application) macro program in Microsoft Project 2003 as an application platform, which automates data input, model structure and outcome interfaces. Given a normally-planned construction project with minimum cost, under a prerequisite that network compression-incurred opportunity income exceeds cost increment, it is lucrative to compress the project network to a desired duration where overall benefit, which refers to the difference between opportunity income and cost increment, is maximized. This problem is referred to as Overall Benefit-Duration Optimization (OBDO). Unlike time-cost trade-off problems that minimize cost, OBDO is a new scheduling optimization scheme for maximum overall benefit and prone to interests of a project owner. In addition, as a win-win solution, incentive fee is introduced in OBDO as an economic reward to contractor. As a combinatorial optimization problem, OBDO is complex and requires iterative selections of task crashing in network compression. Considering the number of possible iterations involved in this optimization process, optimal OBDO solution is difficult and time-consuming. Integrating extensive searching power of GA in combinatorial optimization problems, OBDO is modeled to maximize overall benefit and accounts for network compression-incurred influences to profitability of a construction project. After experimenting on various cases drawn from journal papers and real practice, 3 typical case studies of various-sized project networks are applied to demonstrate feasibility of OBDO concept and practicability of GAOBDO model.
author2 Ting Seng Kiong
author_facet Ting Seng Kiong
Pan, Heng
format Theses and Dissertations
author Pan, Heng
author_sort Pan, Heng
title Overall benefit-duration optimization and its genetic algorithim application in construction project scheduling
title_short Overall benefit-duration optimization and its genetic algorithim application in construction project scheduling
title_full Overall benefit-duration optimization and its genetic algorithim application in construction project scheduling
title_fullStr Overall benefit-duration optimization and its genetic algorithim application in construction project scheduling
title_full_unstemmed Overall benefit-duration optimization and its genetic algorithim application in construction project scheduling
title_sort overall benefit-duration optimization and its genetic algorithim application in construction project scheduling
publishDate 2010
url https://hdl.handle.net/10356/41774
_version_ 1759855613316169728