Overall benefit-duration optimization and its genetic algorithim application in construction project scheduling
In this research, a new concept of Overall Benefit-Duration Optimization (OBDO) is proposed with objective function to maximize overall benefit of a construction project in scheduling process. An integrated solution model is developed by applying genetic algorithm and named as Genetic Algorithm Over...
Saved in:
Main Author: | Pan, Heng |
---|---|
Other Authors: | Ting Seng Kiong |
Format: | Theses and Dissertations |
Language: | English |
Published: |
2010
|
Subjects: | |
Online Access: | https://hdl.handle.net/10356/41774 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
Biologically inspired algorithims for job shop scheduling optimization
by: Low, Malcolm Yoke Hean.
Published: (2010) -
Simulated annealing for multiple construction project scheduling with multiple resource constraints
by: Seyed Mohsen Shahandashti.
Published: (2009) -
Project planning, scheduling and control systems using project management softwares : an investigation into their applications in the Singapore construction industry
by: Damavarapu Dinesh Kumar
Published: (2008) -
Project risk management for underground construction project
by: Yeo, Jun Ning.
Published: (2013) -
Measuring and improving construction productivity on Singapore building project
by: Liong, Julio
Published: (2014)