Project management of surface drain construction with different soil improvement techniques using systems dynamics
Singapore is generally a flat and lowlying island. As such it is very prone to flooding, particularly when heavy rain coincides with high tide. The flood situation is aggravated through the rapid development of the country. Hence, the planning, design and construction of proper drainage infrastructu...
Saved in:
Main Authors: | Ooi, Kian Eng., Ong, Hwee Loon. |
---|---|
Other Authors: | Centre for Advanced Construction Studies |
Format: | Theses and Dissertations |
Language: | English |
Published: |
2011
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/42654 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
Measuring and improving construction productivity on Singapore building project
by: Liong, Julio
Published: (2014) -
Dynamic simulation in the management of a large basement construction project in Singapore
by: Khor, Eng Leong., et al.
Published: (2009) -
Outlook for construction projects in Asia (Pacific region) for the next decade and international competitiveness of Singapore construction industry
by: Koon, Peng Hwee.
Published: (2009) -
Project risk management for underground construction project
by: Yeo, Jun Ning.
Published: (2013) -
Delays of construction projects in Singapore
by: Tee, Audrey Hui Leng., et al.
Published: (2008)