Development of monitoring and control system for wastewater treatment process
The main focus is to incorporate new equipment controls, develop an Human Machine Interface linked to the pilot plant and fully integrate the pilot plant by use of PLC. It shall be able to conclude the optimum control parameters, expected NEWater quality, and cost effectiveness in UF and RO process.
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | Theses and Dissertations |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/4413 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
id |
sg-ntu-dr.10356-4413 |
---|---|
record_format |
dspace |
spelling |
sg-ntu-dr.10356-44132023-07-04T15:17:09Z Development of monitoring and control system for wastewater treatment process Aung Maw Cai, Wenjian School of Electrical and Electronic Engineering DRNTU::Engineering::Electrical and electronic engineering::Control and instrumentation The main focus is to incorporate new equipment controls, develop an Human Machine Interface linked to the pilot plant and fully integrate the pilot plant by use of PLC. It shall be able to conclude the optimum control parameters, expected NEWater quality, and cost effectiveness in UF and RO process. Master of Science (Computer Control and Automation) 2008-09-17T09:51:01Z 2008-09-17T09:51:01Z 2004 2004 Thesis http://hdl.handle.net/10356/4413 Nanyang Technological University application/pdf |
institution |
Nanyang Technological University |
building |
NTU Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NTU Library |
collection |
DR-NTU |
topic |
DRNTU::Engineering::Electrical and electronic engineering::Control and instrumentation |
spellingShingle |
DRNTU::Engineering::Electrical and electronic engineering::Control and instrumentation Aung Maw Development of monitoring and control system for wastewater treatment process |
description |
The main focus is to incorporate new equipment controls, develop an Human Machine Interface linked to the pilot plant and fully integrate the pilot plant by use of PLC. It shall be able to conclude the optimum control parameters, expected NEWater quality, and cost effectiveness in UF and RO process. |
author2 |
Cai, Wenjian |
author_facet |
Cai, Wenjian Aung Maw |
format |
Theses and Dissertations |
author |
Aung Maw |
author_sort |
Aung Maw |
title |
Development of monitoring and control system for wastewater treatment process |
title_short |
Development of monitoring and control system for wastewater treatment process |
title_full |
Development of monitoring and control system for wastewater treatment process |
title_fullStr |
Development of monitoring and control system for wastewater treatment process |
title_full_unstemmed |
Development of monitoring and control system for wastewater treatment process |
title_sort |
development of monitoring and control system for wastewater treatment process |
publishDate |
2008 |
url |
http://hdl.handle.net/10356/4413 |
_version_ |
1772826806549741568 |