Yard crane deployment in container terminals
In recent years, the shipping trades in Singapore increases tremendously and the resources of the container terminals have limited resources. To stay competitive, terminals have to utilize their resources efficiently. This project aims to help terminals to reduce the trucks waiting time in the stora...
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | Final Year Project |
Language: | English |
Published: |
2011
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/44184 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
id |
sg-ntu-dr.10356-44184 |
---|---|
record_format |
dspace |
spelling |
sg-ntu-dr.10356-441842023-03-03T20:25:04Z Yard crane deployment in container terminals Tay, Teck Chin. Huang Shell Ying School of Computer Engineering DRNTU::Engineering::Computer science and engineering::Computer applications::Physical sciences and engineering In recent years, the shipping trades in Singapore increases tremendously and the resources of the container terminals have limited resources. To stay competitive, terminals have to utilize their resources efficiently. This project aims to help terminals to reduce the trucks waiting time in the storage yard by using a simulation approach and the improved least cost heuristic algorithm to deploy yard cranes to high workload block. This report will discuss the design and the result of the experiments using the original least cost heuristic algorithm and its improvements. From this project, it was found that the improvement using weighted scheme do improve the waiting time of the trucks and had the least vertical yard crane gantries. Bachelor of Engineering (Computer Science) 2011-05-27T08:12:48Z 2011-05-27T08:12:48Z 2011 2011 Final Year Project (FYP) http://hdl.handle.net/10356/44184 en Nanyang Technological University 60 p. application/pdf |
institution |
Nanyang Technological University |
building |
NTU Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NTU Library |
collection |
DR-NTU |
language |
English |
topic |
DRNTU::Engineering::Computer science and engineering::Computer applications::Physical sciences and engineering |
spellingShingle |
DRNTU::Engineering::Computer science and engineering::Computer applications::Physical sciences and engineering Tay, Teck Chin. Yard crane deployment in container terminals |
description |
In recent years, the shipping trades in Singapore increases tremendously and the resources of the container terminals have limited resources. To stay competitive, terminals have to utilize their resources efficiently. This project aims to help terminals to reduce the trucks waiting time in the storage yard by using a simulation approach and the improved least cost heuristic algorithm to deploy yard cranes to high workload block. This report will discuss the design and the result of the experiments using the original least cost heuristic algorithm and its improvements. From this project, it was found that the improvement using weighted scheme do improve the waiting time of the trucks and had the least vertical yard crane gantries. |
author2 |
Huang Shell Ying |
author_facet |
Huang Shell Ying Tay, Teck Chin. |
format |
Final Year Project |
author |
Tay, Teck Chin. |
author_sort |
Tay, Teck Chin. |
title |
Yard crane deployment in container terminals |
title_short |
Yard crane deployment in container terminals |
title_full |
Yard crane deployment in container terminals |
title_fullStr |
Yard crane deployment in container terminals |
title_full_unstemmed |
Yard crane deployment in container terminals |
title_sort |
yard crane deployment in container terminals |
publishDate |
2011 |
url |
http://hdl.handle.net/10356/44184 |
_version_ |
1759856406606905344 |