Deciding on planning windows by partitioning time for yard crane management in container terminals

This paper proposes a new dynamic Yard Crane (YC) workload partition scheme in container terminals. The main contribution is the time partitioning algorithm which finds a sequence of time windows to match closely the changing...

全面介紹

Saved in:
書目詳細資料
Main Authors: Guo, Xi, Huang, Shell Ying
其他作者: School of Computer Engineering
格式: Conference or Workshop Item
語言:English
出版: 2011
主題:
在線閱讀:https://hdl.handle.net/10356/93901
http://hdl.handle.net/10220/7080
http://gauss.econ.uni-hamburg.de/iccl2010/index.html
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
機構: Nanyang Technological University
語言: English