Deciding on planning windows by partitioning time for yard crane management in container terminals
This paper proposes a new dynamic Yard Crane (YC) workload partition scheme in container terminals. The main contribution is the time partitioning algorithm which finds a sequence of time windows to match closely the changing...
Saved in:
Main Authors: | Guo, Xi, Huang, Shell Ying |
---|---|
Other Authors: | School of Computer Engineering |
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2011
|
Subjects: | |
Online Access: | https://hdl.handle.net/10356/93901 http://hdl.handle.net/10220/7080 http://gauss.econ.uni-hamburg.de/iccl2010/index.html |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
Simulation-based dynamic partitioning of yard crane workload for container terminal operations
by: Guo, Xi, et al.
Published: (2011) -
Performing A* search for yard crane dispatching in container terminals
by: Guo, Xi, et al.
Published: (2011) -
A simulation based hybrid algorithm for yard crane dispatching in container terminals
by: Guo, Xi, et al.
Published: (2011) -
Yard crane deployment in container terminals
by: Lau, Mei Mei.
Published: (2011) -
Yard crane deployment in container terminals
by: Tay, Teck Chin.
Published: (2011)