Determination of pile damages by an integrity testing

In Singapore, concrete bored piles (CBP) are commonly used in various construction projects. The CBP is constructed by drilling the ground until a desired depth and concrete are cast into the drill hole to complete the pile. However, during the casting, phenomenon such as necking and bulging can hap...

Full description

Saved in:
Bibliographic Details
Main Author: Yeong, Jackie Jiun Weng.
Other Authors: Budi Wibawa
Format: Final Year Project
Language:English
Published: 2011
Subjects:
Online Access:http://hdl.handle.net/10356/45041
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
Description
Summary:In Singapore, concrete bored piles (CBP) are commonly used in various construction projects. The CBP is constructed by drilling the ground until a desired depth and concrete are cast into the drill hole to complete the pile. However, during the casting, phenomenon such as necking and bulging can happen due to ground condition or human error.In the Civil field, there are many ways in checking the integrity of the piles. One such tests, is the Pile Integrity Test (PIT) that will be discussed in this paper to determine the damage location and the ability to quantify damages.