Determination of pile damages by an integrity testing

In Singapore, concrete bored piles (CBP) are commonly used in various construction projects. The CBP is constructed by drilling the ground until a desired depth and concrete are cast into the drill hole to complete the pile. However, during the casting, phenomenon such as necking and bulging can hap...

Full description

Saved in:
Bibliographic Details
Main Author: Yeong, Jackie Jiun Weng.
Other Authors: Budi Wibawa
Format: Final Year Project
Language:English
Published: 2011
Subjects:
Online Access:http://hdl.handle.net/10356/45041
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-45041
record_format dspace
spelling sg-ntu-dr.10356-450412023-03-03T17:17:29Z Determination of pile damages by an integrity testing Yeong, Jackie Jiun Weng. Budi Wibawa School of Civil and Environmental Engineering DRNTU::Engineering::Civil engineering::Geotechnical In Singapore, concrete bored piles (CBP) are commonly used in various construction projects. The CBP is constructed by drilling the ground until a desired depth and concrete are cast into the drill hole to complete the pile. However, during the casting, phenomenon such as necking and bulging can happen due to ground condition or human error.In the Civil field, there are many ways in checking the integrity of the piles. One such tests, is the Pile Integrity Test (PIT) that will be discussed in this paper to determine the damage location and the ability to quantify damages. Bachelor of Engineering (Civil) 2011-06-08T07:10:07Z 2011-06-08T07:10:07Z 2011 2011 Final Year Project (FYP) http://hdl.handle.net/10356/45041 en Nanyang Technological University 51 p. application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
language English
topic DRNTU::Engineering::Civil engineering::Geotechnical
spellingShingle DRNTU::Engineering::Civil engineering::Geotechnical
Yeong, Jackie Jiun Weng.
Determination of pile damages by an integrity testing
description In Singapore, concrete bored piles (CBP) are commonly used in various construction projects. The CBP is constructed by drilling the ground until a desired depth and concrete are cast into the drill hole to complete the pile. However, during the casting, phenomenon such as necking and bulging can happen due to ground condition or human error.In the Civil field, there are many ways in checking the integrity of the piles. One such tests, is the Pile Integrity Test (PIT) that will be discussed in this paper to determine the damage location and the ability to quantify damages.
author2 Budi Wibawa
author_facet Budi Wibawa
Yeong, Jackie Jiun Weng.
format Final Year Project
author Yeong, Jackie Jiun Weng.
author_sort Yeong, Jackie Jiun Weng.
title Determination of pile damages by an integrity testing
title_short Determination of pile damages by an integrity testing
title_full Determination of pile damages by an integrity testing
title_fullStr Determination of pile damages by an integrity testing
title_full_unstemmed Determination of pile damages by an integrity testing
title_sort determination of pile damages by an integrity testing
publishDate 2011
url http://hdl.handle.net/10356/45041
_version_ 1759856105120333824