A two-phase GA model for resource-contrained project scheduling

159 p.

Saved in:
Bibliographic Details
Main Author: Weng, Haijie
Other Authors: Chen Po-Han
Format: Theses and Dissertations
Published: 2011
Subjects:
Online Access:https://hdl.handle.net/10356/46732
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
id sg-ntu-dr.10356-46732
record_format dspace
spelling sg-ntu-dr.10356-467322023-03-03T19:37:22Z A two-phase GA model for resource-contrained project scheduling Weng, Haijie Chen Po-Han School of Civil and Environmental Engineering DRNTU::Engineering::Civil engineering::Construction management 159 p. Project scheduling has a tremendous effect on the performance of a construction project. In project scheduling, problems can arise when each activity can be started at different time points and the resources needed by the activities are limited. Moreover, activities have required conditions to be met, such as precedence relationships, resource demands, etc. To resolve these problems, a two-phase GA (genetic algorithms) model was proposed in this research, in which both the effects of time-cost trade-off and resource scheduling were taken into account. A GA-based time-cost trade-off analysis was adopted to select the execution mode of each activity through the balance of time and cost, followed by utilization of a GA-based resource scheduling method to generate a feasible schedule which may satisfy all the project constraints. MASTER OF ENGINEERING (CEE) 2011-12-23T07:25:25Z 2011-12-23T07:25:25Z 2005 2005 Thesis Weng, H. (2005). A two-phase GA model for resource-contrained project scheduling. Master’s thesis, Nanyang Technological University, Singapore. https://hdl.handle.net/10356/46732 10.32657/10356/46732 Nanyang Technological University application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
topic DRNTU::Engineering::Civil engineering::Construction management
spellingShingle DRNTU::Engineering::Civil engineering::Construction management
Weng, Haijie
A two-phase GA model for resource-contrained project scheduling
description 159 p.
author2 Chen Po-Han
author_facet Chen Po-Han
Weng, Haijie
format Theses and Dissertations
author Weng, Haijie
author_sort Weng, Haijie
title A two-phase GA model for resource-contrained project scheduling
title_short A two-phase GA model for resource-contrained project scheduling
title_full A two-phase GA model for resource-contrained project scheduling
title_fullStr A two-phase GA model for resource-contrained project scheduling
title_full_unstemmed A two-phase GA model for resource-contrained project scheduling
title_sort two-phase ga model for resource-contrained project scheduling
publishDate 2011
url https://hdl.handle.net/10356/46732
_version_ 1759857878120792064