A two-phase GA model for resource-contrained project scheduling
159 p.
Saved in:
Main Author: | Weng, Haijie |
---|---|
Other Authors: | Chen Po-Han |
Format: | Theses and Dissertations |
Published: |
2011
|
Subjects: | |
Online Access: | https://hdl.handle.net/10356/46732 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Similar Items
-
Simulated annealing for multiple construction project scheduling with multiple resource constraints
by: Seyed Mohsen Shahandashti.
Published: (2009) -
Project planning, scheduling and control systems using project management softwares : an investigation into their applications in the Singapore construction industry
by: Damavarapu Dinesh Kumar
Published: (2008) -
Overall benefit-duration optimization and its genetic algorithim application in construction project scheduling
by: Pan, Heng
Published: (2010) -
Commercial viability of two proposed privately-financed infrastructure projects in Singapore
by: Lim, Teck Leong.
Published: (2009) -
Financial risk modelling for infrastructure projects
by: Cheah, Charles Yuen Jen.
Published: (2008)