Reducing simulation costs in embedded simulation in yard crane dispatching in container terminals

Computational costs of the embedded simulation in optimising algorithm with NP-hard problems are very likely to be considerable. One of the optimising algorithm that is NP-hard is YC dispatching. Thus, it is important to reduce these simulation costs in YC dispatching. In this project, we will...

Full description

Saved in:
Bibliographic Details
Main Author: Ong, Yi Long.
Other Authors: Huang Shell Ying
Format: Final Year Project
Language:English
Published: 2013
Subjects:
Online Access:http://hdl.handle.net/10356/52795
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-52795
record_format dspace
spelling sg-ntu-dr.10356-527952023-03-03T20:29:33Z Reducing simulation costs in embedded simulation in yard crane dispatching in container terminals Ong, Yi Long. Huang Shell Ying School of Computer Engineering DRNTU::Engineering::Computer science and engineering::Theory of computation::Analysis of algorithms and problem complexity DRNTU::Engineering::Computer science and engineering::Computing methodologies::Simulation and modeling Computational costs of the embedded simulation in optimising algorithm with NP-hard problems are very likely to be considerable. One of the optimising algorithm that is NP-hard is YC dispatching. Thus, it is important to reduce these simulation costs in YC dispatching. In this project, we will discuss 2 approaches to reduce simulation cost in the optimisation algorithm proposed in Embedded Simulation in Yard Crane Dispatching to Minimize Job Tardiness in Container Terminals by Huang et al. In the optimisation algorithm proposed, the tardiness of the sequenced job(s) has to be evaluated each time after a job is added to the job list. Our approaches on reducing the simulation cost will be saving the cost(s) and state(s) of the partially completed job(s). From the experimental results, it was found that one approaches significantly reduces the computational time of the optimisation algorithm while the other not only did not reduce the computation time but also do badly against the original optimisation algorithm. We will also analyse the reasons for the other approach which fails to reduce the computational time. Bachelor of Engineering (Computer Science) 2013-05-27T07:12:41Z 2013-05-27T07:12:41Z 2013 2013 Final Year Project (FYP) http://hdl.handle.net/10356/52795 en Nanyang Technological University 85 p. application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
language English
topic DRNTU::Engineering::Computer science and engineering::Theory of computation::Analysis of algorithms and problem complexity
DRNTU::Engineering::Computer science and engineering::Computing methodologies::Simulation and modeling
spellingShingle DRNTU::Engineering::Computer science and engineering::Theory of computation::Analysis of algorithms and problem complexity
DRNTU::Engineering::Computer science and engineering::Computing methodologies::Simulation and modeling
Ong, Yi Long.
Reducing simulation costs in embedded simulation in yard crane dispatching in container terminals
description Computational costs of the embedded simulation in optimising algorithm with NP-hard problems are very likely to be considerable. One of the optimising algorithm that is NP-hard is YC dispatching. Thus, it is important to reduce these simulation costs in YC dispatching. In this project, we will discuss 2 approaches to reduce simulation cost in the optimisation algorithm proposed in Embedded Simulation in Yard Crane Dispatching to Minimize Job Tardiness in Container Terminals by Huang et al. In the optimisation algorithm proposed, the tardiness of the sequenced job(s) has to be evaluated each time after a job is added to the job list. Our approaches on reducing the simulation cost will be saving the cost(s) and state(s) of the partially completed job(s). From the experimental results, it was found that one approaches significantly reduces the computational time of the optimisation algorithm while the other not only did not reduce the computation time but also do badly against the original optimisation algorithm. We will also analyse the reasons for the other approach which fails to reduce the computational time.
author2 Huang Shell Ying
author_facet Huang Shell Ying
Ong, Yi Long.
format Final Year Project
author Ong, Yi Long.
author_sort Ong, Yi Long.
title Reducing simulation costs in embedded simulation in yard crane dispatching in container terminals
title_short Reducing simulation costs in embedded simulation in yard crane dispatching in container terminals
title_full Reducing simulation costs in embedded simulation in yard crane dispatching in container terminals
title_fullStr Reducing simulation costs in embedded simulation in yard crane dispatching in container terminals
title_full_unstemmed Reducing simulation costs in embedded simulation in yard crane dispatching in container terminals
title_sort reducing simulation costs in embedded simulation in yard crane dispatching in container terminals
publishDate 2013
url http://hdl.handle.net/10356/52795
_version_ 1759857506876653568