Critical chain project control for fast track projects

The main objectives of this thesis are to review conventional Critical Path Method (CPM) and newly developed Critical Chain (CC) scheduling techniques, show how they can be applied through a case study, highlight the difference between the techniques and discuss the limitations of CC scheduling.

Saved in:
Bibliographic Details
Main Author: Visvanathan Rajesh
Other Authors: Britton, Graeme Arthur
Format: Theses and Dissertations
Published: 2008
Subjects:
Online Access:http://hdl.handle.net/10356/5328
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
id sg-ntu-dr.10356-5328
record_format dspace
spelling sg-ntu-dr.10356-53282023-03-11T16:57:14Z Critical chain project control for fast track projects Visvanathan Rajesh Britton, Graeme Arthur School of Mechanical and Aerospace Engineering DRNTU::Engineering::Manufacturing::Production management The main objectives of this thesis are to review conventional Critical Path Method (CPM) and newly developed Critical Chain (CC) scheduling techniques, show how they can be applied through a case study, highlight the difference between the techniques and discuss the limitations of CC scheduling. Master of Science (Computer Integrated Manufacturing) 2008-09-17T10:47:55Z 2008-09-17T10:47:55Z 2005 2005 Thesis http://hdl.handle.net/10356/5328 Nanyang Technological University application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
topic DRNTU::Engineering::Manufacturing::Production management
spellingShingle DRNTU::Engineering::Manufacturing::Production management
Visvanathan Rajesh
Critical chain project control for fast track projects
description The main objectives of this thesis are to review conventional Critical Path Method (CPM) and newly developed Critical Chain (CC) scheduling techniques, show how they can be applied through a case study, highlight the difference between the techniques and discuss the limitations of CC scheduling.
author2 Britton, Graeme Arthur
author_facet Britton, Graeme Arthur
Visvanathan Rajesh
format Theses and Dissertations
author Visvanathan Rajesh
author_sort Visvanathan Rajesh
title Critical chain project control for fast track projects
title_short Critical chain project control for fast track projects
title_full Critical chain project control for fast track projects
title_fullStr Critical chain project control for fast track projects
title_full_unstemmed Critical chain project control for fast track projects
title_sort critical chain project control for fast track projects
publishDate 2008
url http://hdl.handle.net/10356/5328
_version_ 1761781457136648192