Discrete-event modeling a large material handling system
This project describes the airport warehouse material handling system. Material handling system (MHS) is an indispensable part in almost all of industrial production system. Material handlings is defined as simply store materials, or use a series of transportations equipments to move the materials f...
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | Final Year Project |
Language: | English |
Published: |
2013
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/54419 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
id |
sg-ntu-dr.10356-54419 |
---|---|
record_format |
dspace |
spelling |
sg-ntu-dr.10356-544192023-07-07T16:08:43Z Discrete-event modeling a large material handling system He, Hang. Su Rong School of Electrical and Electronic Engineering DRNTU::Engineering::Electrical and electronic engineering::Control and instrumentation::Control engineering This project describes the airport warehouse material handling system. Material handling system (MHS) is an indispensable part in almost all of industrial production system. Material handlings is defined as simply store materials, or use a series of transportations equipments to move the materials for some processing purpose such as sorting and repackaging. An effective MHS will increase efficiency and productivity of warehouse operation. Considering the large number of transportation equipments and storage components in an MHS, it is essential to optimize its performance with the use of the right materials handling technology. This report illustrates the use of new modeling formalism to simulate a complex MHS in a dynamic environment, consists of analyzing system requirements, using state-labeled finite-state automata to model different component in the system and compose these components together to form a complex model refer to the requirements. After that, use MATLAB to simulate the system model. Bachelor of Engineering 2013-06-20T03:03:16Z 2013-06-20T03:03:16Z 2013 2013 Final Year Project (FYP) http://hdl.handle.net/10356/54419 en Nanyang Technological University 48 p. application/pdf |
institution |
Nanyang Technological University |
building |
NTU Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NTU Library |
collection |
DR-NTU |
language |
English |
topic |
DRNTU::Engineering::Electrical and electronic engineering::Control and instrumentation::Control engineering |
spellingShingle |
DRNTU::Engineering::Electrical and electronic engineering::Control and instrumentation::Control engineering He, Hang. Discrete-event modeling a large material handling system |
description |
This project describes the airport warehouse material handling system. Material handling system (MHS) is an indispensable part in almost all of industrial production system. Material handlings is defined as simply store materials, or use a series of transportations equipments to move the materials for some processing purpose such as sorting and repackaging. An effective MHS will increase efficiency and productivity of warehouse operation. Considering the large number of transportation equipments and storage components in an MHS, it is essential to optimize its performance with the use of the right materials handling technology. This report illustrates the use of new modeling formalism to simulate a complex MHS in a dynamic environment, consists of analyzing system requirements, using state-labeled finite-state automata to model different component in the system and compose these components together to form a complex model refer to the requirements. After that, use MATLAB to simulate the system model. |
author2 |
Su Rong |
author_facet |
Su Rong He, Hang. |
format |
Final Year Project |
author |
He, Hang. |
author_sort |
He, Hang. |
title |
Discrete-event modeling a large material handling system |
title_short |
Discrete-event modeling a large material handling system |
title_full |
Discrete-event modeling a large material handling system |
title_fullStr |
Discrete-event modeling a large material handling system |
title_full_unstemmed |
Discrete-event modeling a large material handling system |
title_sort |
discrete-event modeling a large material handling system |
publishDate |
2013 |
url |
http://hdl.handle.net/10356/54419 |
_version_ |
1772826945806925824 |