Prototype GA-enhanced multi-objective dynamic scheduler for multiple shop floors

This thesis describes the development of a prototype genetic algorithm (GA)-enhanced multi-objective dynamic scheduler for multiple shop floors. A framework of the prototype scheduler, which accepts data input from a scheduling database or a formatted file and outputs a near-optimal schedule, is pro...

Full description

Saved in:
Bibliographic Details
Main Author: Yin, Xiaofeng.
Other Authors: Khoo, Li Pheng
Format: Theses and Dissertations
Published: 2008
Subjects:
Online Access:http://hdl.handle.net/10356/5486
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
id sg-ntu-dr.10356-5486
record_format dspace
spelling sg-ntu-dr.10356-54862023-03-11T17:38:21Z Prototype GA-enhanced multi-objective dynamic scheduler for multiple shop floors Yin, Xiaofeng. Khoo, Li Pheng School of Mechanical and Production Engineering DRNTU::Engineering::Manufacturing::Production management This thesis describes the development of a prototype genetic algorithm (GA)-enhanced multi-objective dynamic scheduler for multiple shop floors. A framework of the prototype scheduler, which accepts data input from a scheduling database or a formatted file and outputs a near-optimal schedule, is proposed. Master of Engineering (MPE) 2008-09-17T10:51:47Z 2008-09-17T10:51:47Z 2000 2000 Thesis http://hdl.handle.net/10356/5486 Nanyang Technological University application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
topic DRNTU::Engineering::Manufacturing::Production management
spellingShingle DRNTU::Engineering::Manufacturing::Production management
Yin, Xiaofeng.
Prototype GA-enhanced multi-objective dynamic scheduler for multiple shop floors
description This thesis describes the development of a prototype genetic algorithm (GA)-enhanced multi-objective dynamic scheduler for multiple shop floors. A framework of the prototype scheduler, which accepts data input from a scheduling database or a formatted file and outputs a near-optimal schedule, is proposed.
author2 Khoo, Li Pheng
author_facet Khoo, Li Pheng
Yin, Xiaofeng.
format Theses and Dissertations
author Yin, Xiaofeng.
author_sort Yin, Xiaofeng.
title Prototype GA-enhanced multi-objective dynamic scheduler for multiple shop floors
title_short Prototype GA-enhanced multi-objective dynamic scheduler for multiple shop floors
title_full Prototype GA-enhanced multi-objective dynamic scheduler for multiple shop floors
title_fullStr Prototype GA-enhanced multi-objective dynamic scheduler for multiple shop floors
title_full_unstemmed Prototype GA-enhanced multi-objective dynamic scheduler for multiple shop floors
title_sort prototype ga-enhanced multi-objective dynamic scheduler for multiple shop floors
publishDate 2008
url http://hdl.handle.net/10356/5486
_version_ 1761781458885672960