Prototype GA-enhanced multi-objective dynamic scheduler for multiple shop floors
This thesis describes the development of a prototype genetic algorithm (GA)-enhanced multi-objective dynamic scheduler for multiple shop floors. A framework of the prototype scheduler, which accepts data input from a scheduling database or a formatted file and outputs a near-optimal schedule, is pro...
Saved in:
Main Author: | Yin, Xiaofeng. |
---|---|
Other Authors: | Khoo, Li Pheng |
Format: | Theses and Dissertations |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/5486 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Similar Items
-
Modelling of manufacturing shop floor
by: Leung, Whye Keong.
Published: (2008) -
Multi-objective dynamic scheduling of serial and batch manufacturing processes
by: Gupta, Amit Kumar
Published: (2008) -
CIM implementation of the molding shop floor in a manufacturing plant
by: Khor, Karen Jor Wei.
Published: (2008) -
Multi-criteria re-entrant jobs scheduling problems using GA and AHP
by: Lin, Danping.
Published: (2013) -
Multi-objective scheduling in PCB assembly manufacturing : discreet event simulation approach
by: Zuo, Jie
Published: (2008)