A simulation-based analysis to improve line throughput for high-volume manufacturing
This project investigates a production line that faces fluctuating demand with seasonal pattern. The cumulative capacity exceeds the cumulative demand in a one year period; however, its expected weekly capacity is not able to meet the weekly demand during the peak season. In addition, examining its...
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | Theses and Dissertations |
Language: | English |
Published: |
2014
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/60698 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Summary: | This project investigates a production line that faces fluctuating demand with seasonal pattern. The cumulative capacity exceeds the cumulative demand in a one year period; however, its expected weekly capacity is not able to meet the weekly demand during the peak season. In addition, examining its past production outputs, there existed a large gap below the expected capacity. Therefore, it has become crucial to study the significant factors influencing the line performance. |
---|