A simulation-based analysis to improve line throughput for high-volume manufacturing
This project investigates a production line that faces fluctuating demand with seasonal pattern. The cumulative capacity exceeds the cumulative demand in a one year period; however, its expected weekly capacity is not able to meet the weekly demand during the peak season. In addition, examining its...
Saved in:
Main Author: | Xia, Hua |
---|---|
Other Authors: | Appa Iyer Sivakumar |
Format: | Theses and Dissertations |
Language: | English |
Published: |
2014
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/60698 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
Simulation as a productivity improvement tool in a component manufacturing line
by: Tan, Keng Hwee.
Published: (2009) -
Performance improvement simulation of a manufacturing system
by: Liu, Haoyu
Published: (2014) -
Modeling the impact of Kanban design to cycle time, throughput and WIP in a high volume manufacturing system
by: Sio, Dhesirey Beryl Ko
Published: (2009) -
Simulation based analysis of cycle time and throughput in semiconductor assembly process integration
by: Muruhathasan Yogathasan.
Published: (2008) -
A simulation study of a PC manufacturing line
by: Tham, Chee Yuen.
Published: (2009)