Development of a system to ensure execution of multiple projects of steam turbine derivative designs
Bharat Heavy Electricals Limited (BHEL), a Public Sector Unit, is India’s largest manufacturer of power generation equipment. To maintain its market dominance, the company has launched a new derivative product lines in 2008 and diversified its products. However, this increase in the number of orders...
Saved in:
Main Author: | Ankita, Awasthi |
---|---|
Other Authors: | Lee Siang Guan, Stephen |
Format: | Theses and Dissertations |
Language: | English |
Published: |
2016
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/66287 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
Ensuring sustenance of Singapore third generation army's weapon systems
by: Phua, Debbie Yee Lei
Published: (2016) -
Distributed scheduling a set of e-puck mobile robots to ensure minimum execution time
by: Sun, Chunyang
Published: (2015) -
Performance testing of steam ejector air conditioning system
by: Yap, Fang Yu.
Published: (2010) -
Performance testing of steam ejector air conditioning system
by: Ong, Soon Beng.
Published: (2009) -
DESIGN OF STEAM TURBINE EFFICIENCY MONITORING SYSTEM WITH DATA INFRASTRUCTURE
by: (13313019), Septian