Contruction of underground subway for Outram Park Mass Rapid Transit station

The North East Line (NEL) of MRT tunnels cross under the existing, operational MRT East-West line at Outram Park station. The new construction involves forming the NEL station with in the 2nd reserve zone of railway protection, excavation approximately 8 to llm from the operational tunnels. The st...

全面介紹

Saved in:
書目詳細資料
主要作者: Chinniah, Ravindran.
其他作者: Ting, Seng Kiong
格式: Theses and Dissertations
出版: 2008
主題:
在線閱讀:http://hdl.handle.net/10356/6718
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!

相似書籍