Contruction of underground subway for Outram Park Mass Rapid Transit station
The North East Line (NEL) of MRT tunnels cross under the existing, operational MRT East-West line at Outram Park station. The new construction involves forming the NEL station with in the 2nd reserve zone of railway protection, excavation approximately 8 to llm from the operational tunnels. The st...
Saved in:
主要作者: | Chinniah, Ravindran. |
---|---|
其他作者: | Ting, Seng Kiong |
格式: | Theses and Dissertations |
出版: |
2008
|
主題: | |
在線閱讀: | http://hdl.handle.net/10356/6718 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
相似書籍
-
Stress redistribution in rock mass surrounding underground excavations
由: Liau, Tai Wee.
出版: (2011) -
Stability analysis of underground excavation
由: Nguyen, Danh Long.
出版: (2010) -
Stability and deformation of underground excavation in rocks
由: Koh, Dezhan.
出版: (2012) -
Underground construction : case studies and analysis
由: Boon, Chia Weng.
出版: (2009) -
Stability and deformation of underground excavation in rocks
由: Foo, Jason Zhi Pin.
出版: (2012)