Contruction of underground subway for Outram Park Mass Rapid Transit station
The North East Line (NEL) of MRT tunnels cross under the existing, operational MRT East-West line at Outram Park station. The new construction involves forming the NEL station with in the 2nd reserve zone of railway protection, excavation approximately 8 to llm from the operational tunnels. The st...
Saved in:
Main Author: | Chinniah, Ravindran. |
---|---|
Other Authors: | Ting, Seng Kiong |
Format: | Theses and Dissertations |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/6718 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Similar Items
-
Stress redistribution in rock mass surrounding underground excavations
by: Liau, Tai Wee.
Published: (2011) -
Stability analysis of underground excavation
by: Nguyen, Danh Long.
Published: (2010) -
Stability and deformation of underground excavation in rocks
by: Koh, Dezhan.
Published: (2012) -
Underground construction : case studies and analysis
by: Boon, Chia Weng.
Published: (2009) -
Stability and deformation of underground excavation in rocks
by: Foo, Jason Zhi Pin.
Published: (2012)