Investigation on inventory network

Recently, the inventory optimization has been a very popular topic in supply chain area. Because it is very important commercial function in the warehouse stock flow. Warehouse overstock will lead to a financial problem Due to poor planning of replenishment, the company capital chain will be affecte...

Full description

Saved in:
Bibliographic Details
Main Authors: FU, JIAN, Fu, Jian
Other Authors: Ma Maode
Format: Final Year Project
Language:English
Published: 2016
Subjects:
Online Access:http://hdl.handle.net/10356/67633
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-67633
record_format dspace
spelling sg-ntu-dr.10356-676332023-07-07T15:41:38Z Investigation on inventory network FU, JIAN Fu, Jian Ma Maode School of Electrical and Electronic Engineering DRNTU::Engineering::Electrical and electronic engineering::Computer hardware, software and systems Recently, the inventory optimization has been a very popular topic in supply chain area. Because it is very important commercial function in the warehouse stock flow. Warehouse overstock will lead to a financial problem Due to poor planning of replenishment, the company capital chain will be affected due to cash can’t flow out and huge warehouse storage fee. On the other hand, a shortage stock will reduce the customer satisfaction rate. The goods delivery time will also be delay or postponed. The reputation of a company will be affect by such delay shipment. How to plan and manage an inventory network and warehouse storage become a critical element for company operation. The objective of this project is to use computer simulation technology to build up a warehouse model to run simulation and optimize the warehouse delay time. There are four sub warehouse and one main warehouse in this warehouse model. The manufacture was located in the main warehouse.in order to understand the relationship between warehouse variables and average total delay. In this project, we will carry out a few of simulation test for each warehouse parameter, such as, request arrival rate, request amount, production line capability and cargo capability. Last but not least, we will obtain the best warehouse storage value setting to get an minimum delay time per customer order. Bachelor of Engineering 2016-05-18T08:45:13Z 2016-05-18T08:45:13Z 2016 Final Year Project (FYP) http://hdl.handle.net/10356/67633 en Nanyang Technological University 66 p. application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
language English
topic DRNTU::Engineering::Electrical and electronic engineering::Computer hardware, software and systems
spellingShingle DRNTU::Engineering::Electrical and electronic engineering::Computer hardware, software and systems
FU, JIAN
Fu, Jian
Investigation on inventory network
description Recently, the inventory optimization has been a very popular topic in supply chain area. Because it is very important commercial function in the warehouse stock flow. Warehouse overstock will lead to a financial problem Due to poor planning of replenishment, the company capital chain will be affected due to cash can’t flow out and huge warehouse storage fee. On the other hand, a shortage stock will reduce the customer satisfaction rate. The goods delivery time will also be delay or postponed. The reputation of a company will be affect by such delay shipment. How to plan and manage an inventory network and warehouse storage become a critical element for company operation. The objective of this project is to use computer simulation technology to build up a warehouse model to run simulation and optimize the warehouse delay time. There are four sub warehouse and one main warehouse in this warehouse model. The manufacture was located in the main warehouse.in order to understand the relationship between warehouse variables and average total delay. In this project, we will carry out a few of simulation test for each warehouse parameter, such as, request arrival rate, request amount, production line capability and cargo capability. Last but not least, we will obtain the best warehouse storage value setting to get an minimum delay time per customer order.
author2 Ma Maode
author_facet Ma Maode
FU, JIAN
Fu, Jian
format Final Year Project
author FU, JIAN
Fu, Jian
author_sort FU, JIAN
title Investigation on inventory network
title_short Investigation on inventory network
title_full Investigation on inventory network
title_fullStr Investigation on inventory network
title_full_unstemmed Investigation on inventory network
title_sort investigation on inventory network
publishDate 2016
url http://hdl.handle.net/10356/67633
_version_ 1772828366969241600