Improving the appointment scheduling system of a clinic
With an ever increasing need for timely healthcare, clinics and hospitals have to carefully manage their patients’ waiting time. This project aims to reduce the patient waiting time in an eye clinic located in Tanjong Pagar. Data on the movement of patients was collected over the course of six work...
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | Final Year Project |
Language: | English |
Published: |
2016
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/68024 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
id |
sg-ntu-dr.10356-68024 |
---|---|
record_format |
dspace |
spelling |
sg-ntu-dr.10356-680242023-03-04T18:38:43Z Improving the appointment scheduling system of a clinic Lim, Zi Wang Rajesh Piplani School of Mechanical and Aerospace Engineering DRNTU::Engineering With an ever increasing need for timely healthcare, clinics and hospitals have to carefully manage their patients’ waiting time. This project aims to reduce the patient waiting time in an eye clinic located in Tanjong Pagar. Data on the movement of patients was collected over the course of six work days in January, from which the probabilities and distribution of process times were generated using ARENA’s Input Analyzer and Microsoft Excel. A model simulating the work processes in the clinic was then constructed and validated on ARENA. After which, modifications were made on the model to understand their effects on the patients’ average waiting time. Bachelor of Engineering (Mechanical Engineering) 2016-05-24T03:25:15Z 2016-05-24T03:25:15Z 2016 Final Year Project (FYP) http://hdl.handle.net/10356/68024 en Nanyang Technological University 59 p. application/pdf |
institution |
Nanyang Technological University |
building |
NTU Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NTU Library |
collection |
DR-NTU |
language |
English |
topic |
DRNTU::Engineering |
spellingShingle |
DRNTU::Engineering Lim, Zi Wang Improving the appointment scheduling system of a clinic |
description |
With an ever increasing need for timely healthcare, clinics and hospitals have to carefully manage their patients’ waiting time. This project aims to reduce the patient waiting time in an eye clinic located in Tanjong Pagar. Data on the movement of patients was collected over the course of six work days in January, from which the probabilities and distribution of process times were generated using ARENA’s Input Analyzer and Microsoft Excel. A model simulating the work processes in the clinic was then constructed and validated on ARENA. After which, modifications were made on the model to understand their effects on the patients’ average waiting time. |
author2 |
Rajesh Piplani |
author_facet |
Rajesh Piplani Lim, Zi Wang |
format |
Final Year Project |
author |
Lim, Zi Wang |
author_sort |
Lim, Zi Wang |
title |
Improving the appointment scheduling system of a clinic |
title_short |
Improving the appointment scheduling system of a clinic |
title_full |
Improving the appointment scheduling system of a clinic |
title_fullStr |
Improving the appointment scheduling system of a clinic |
title_full_unstemmed |
Improving the appointment scheduling system of a clinic |
title_sort |
improving the appointment scheduling system of a clinic |
publishDate |
2016 |
url |
http://hdl.handle.net/10356/68024 |
_version_ |
1759853564455288832 |