Logistics management of the precast elements for industrial scale construction project through BIM-based semi-automated smart crane system
Presently, increasing productivity is essential in Singapore due to Singapore’s aging population and decrease of unskilled labour workers. Hence, the use of technology will facilitate in increasing productivity in the construction industry. One promising technology which can aid in improving product...
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | Final Year Project |
Language: | English |
Published: |
2017
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/72975 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
id |
sg-ntu-dr.10356-72975 |
---|---|
record_format |
dspace |
spelling |
sg-ntu-dr.10356-729752023-03-04T19:19:05Z Logistics management of the precast elements for industrial scale construction project through BIM-based semi-automated smart crane system Chan, Wan Rong Li King Ho Holden School of Mechanical and Aerospace Engineering DRNTU::Engineering Presently, increasing productivity is essential in Singapore due to Singapore’s aging population and decrease of unskilled labour workers. Hence, the use of technology will facilitate in increasing productivity in the construction industry. One promising technology which can aid in improving productivity is the RFID technology, but it is not typically seen in the industry. The objective of this project is to analyse the feasibility in using RFID system for the construction processes and discuss if the utilization of RFID can improve the overall construction processes. A prototype is developed to show the feasibility of using the technology. The focus of the prototype is to show the feasibility of implementing RFID in the logistics management of precast concrete components. The benefits reaping from using the RFID is then discussed and is concluded that using RFID is not only beneficial to materials management but also for other construction processes such as during crane operation and overall project scheduling. Bachelor of Engineering (Mechanical Engineering) 2017-12-18T02:59:55Z 2017-12-18T02:59:55Z 2017 Final Year Project (FYP) http://hdl.handle.net/10356/72975 en Nanyang Technological University 65 p. application/pdf |
institution |
Nanyang Technological University |
building |
NTU Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NTU Library |
collection |
DR-NTU |
language |
English |
topic |
DRNTU::Engineering |
spellingShingle |
DRNTU::Engineering Chan, Wan Rong Logistics management of the precast elements for industrial scale construction project through BIM-based semi-automated smart crane system |
description |
Presently, increasing productivity is essential in Singapore due to Singapore’s aging population and decrease of unskilled labour workers. Hence, the use of technology will facilitate in increasing productivity in the construction industry. One promising technology which can aid in improving productivity is the RFID technology, but it is not typically seen in the industry. The objective of this project is to analyse the feasibility in using RFID system for the construction processes and discuss if the utilization of RFID can improve the overall construction processes. A prototype is developed to show the feasibility of using the technology. The focus of the prototype is to show the feasibility of implementing RFID in the logistics management of precast concrete components. The benefits reaping from using the RFID is then discussed and is concluded that using RFID is not only beneficial to materials management but also for other construction processes such as during crane operation and overall project scheduling. |
author2 |
Li King Ho Holden |
author_facet |
Li King Ho Holden Chan, Wan Rong |
format |
Final Year Project |
author |
Chan, Wan Rong |
author_sort |
Chan, Wan Rong |
title |
Logistics management of the precast elements for industrial scale construction project through BIM-based semi-automated smart crane system |
title_short |
Logistics management of the precast elements for industrial scale construction project through BIM-based semi-automated smart crane system |
title_full |
Logistics management of the precast elements for industrial scale construction project through BIM-based semi-automated smart crane system |
title_fullStr |
Logistics management of the precast elements for industrial scale construction project through BIM-based semi-automated smart crane system |
title_full_unstemmed |
Logistics management of the precast elements for industrial scale construction project through BIM-based semi-automated smart crane system |
title_sort |
logistics management of the precast elements for industrial scale construction project through bim-based semi-automated smart crane system |
publishDate |
2017 |
url |
http://hdl.handle.net/10356/72975 |
_version_ |
1759858201538330624 |