Implementation of a closed-loop-system to reduce tapeout cycle time

Semiconductor industry is an environment where productivity and reliability has to be continuously improved to comply with the rule of Moore’s law and to meet the anticipated technological changes in lithography techniques. Tapeout cycle time reduction plays an important role in increasing the produ...

Full description

Saved in:
Bibliographic Details
Main Author: Viswanathan Surya
Other Authors: Zhou Xing
Format: Theses and Dissertations
Language:English
Published: 2018
Subjects:
Online Access:http://hdl.handle.net/10356/73147
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-73147
record_format dspace
spelling sg-ntu-dr.10356-731472023-07-04T15:05:32Z Implementation of a closed-loop-system to reduce tapeout cycle time Viswanathan Surya Zhou Xing School of Electrical and Electronic Engineering DRNTU::Engineering::Electrical and electronic engineering Semiconductor industry is an environment where productivity and reliability has to be continuously improved to comply with the rule of Moore’s law and to meet the anticipated technological changes in lithography techniques. Tapeout cycle time reduction plays an important role in increasing the productivity of semiconductor manufacturing. In this thesis, a feedback control has been established between the fab manufacturing process and the design tapeout process which can help to reduce the tapeout cycle time thereby increasing productivity. Reliability is improved by providing a feedback mechanism to the design through a parameter called RATING. The existing open loop system to feed forward design data to Fab has been complemented with a feedback system developed in the form of a visual aid to enable tapeout cycle time reduction. A statistical analysis on the cycle time involved with and without the feedback from the control system is carried out and the percentage of disposition cycle time reduced is found. Automation has been enabled to allow users to provide rating that can be used as an indicator for improving the design quality. In future, depending on the rating given to design breaches, automation can be setup to indicate the designer the need for the design changes or to the fab for the changes in the manufacturing process. Master of Science (Green Electronics) 2018-01-03T07:50:48Z 2018-01-03T07:50:48Z 2018 Thesis http://hdl.handle.net/10356/73147 en 59 p. application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
language English
topic DRNTU::Engineering::Electrical and electronic engineering
spellingShingle DRNTU::Engineering::Electrical and electronic engineering
Viswanathan Surya
Implementation of a closed-loop-system to reduce tapeout cycle time
description Semiconductor industry is an environment where productivity and reliability has to be continuously improved to comply with the rule of Moore’s law and to meet the anticipated technological changes in lithography techniques. Tapeout cycle time reduction plays an important role in increasing the productivity of semiconductor manufacturing. In this thesis, a feedback control has been established between the fab manufacturing process and the design tapeout process which can help to reduce the tapeout cycle time thereby increasing productivity. Reliability is improved by providing a feedback mechanism to the design through a parameter called RATING. The existing open loop system to feed forward design data to Fab has been complemented with a feedback system developed in the form of a visual aid to enable tapeout cycle time reduction. A statistical analysis on the cycle time involved with and without the feedback from the control system is carried out and the percentage of disposition cycle time reduced is found. Automation has been enabled to allow users to provide rating that can be used as an indicator for improving the design quality. In future, depending on the rating given to design breaches, automation can be setup to indicate the designer the need for the design changes or to the fab for the changes in the manufacturing process.
author2 Zhou Xing
author_facet Zhou Xing
Viswanathan Surya
format Theses and Dissertations
author Viswanathan Surya
author_sort Viswanathan Surya
title Implementation of a closed-loop-system to reduce tapeout cycle time
title_short Implementation of a closed-loop-system to reduce tapeout cycle time
title_full Implementation of a closed-loop-system to reduce tapeout cycle time
title_fullStr Implementation of a closed-loop-system to reduce tapeout cycle time
title_full_unstemmed Implementation of a closed-loop-system to reduce tapeout cycle time
title_sort implementation of a closed-loop-system to reduce tapeout cycle time
publishDate 2018
url http://hdl.handle.net/10356/73147
_version_ 1772829155350544384