A study on BIM-based performance and productivity evaluation of PPVC construction technologies / methods
Building and Construction Authority’s (BCA) encourages any improvement that can be fulfilled in the field of construction productivity. There are several incentive technologies which are introduced or encouraged by BCA to speed up the construction, where higher productivity gains can be achieved. Bu...
Saved in:
Main Author: | Foo, Yee Zin |
---|---|
Other Authors: | Tiong Lee Kong, Robert |
Format: | Final Year Project |
Language: | English |
Published: |
2018
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/75376 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
A study on the productivity evaluation of building information modelling (BIM) based prefabricated prefinished volumetric construction (PPVC) project
by: Fernandez, Priscilla Crystal
Published: (2017) -
A study on integrating BIM with RFID to develop a PPVC logistic management and installation system
by: Wu, Heng
Published: (2017) -
Performance monitoring of PPVC connectors
by: S Nancy Htoi San
Published: (2021) -
Performance monitoring of PPVC connectors
by: Tan, Fook Aik
Published: (2021) -
A modular system for prefabricated prefinished volumetric construction (PPVC) - member behaviour
by: Ng, Maggie
Published: (2015)