Dynamic scheduling of precast element installation by probabilistic approach & IFC exchange behavior study for interoperability in BIM software
Construction processes are stochastic in nature. Therefore, deterministic analysis of construction processes fails to incorporate uncertainty in scheduling models of construction operations. This project focusses on using probabilistic approach to account for the uncertainty and develop models that...
Saved in:
Main Author: | Shah, Vishal Snehal |
---|---|
Other Authors: | Tiong Lee Kong, Robert |
Format: | Final Year Project |
Language: | English |
Published: |
2019
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/77712 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
BIM : interoperability issues between BIM authoring software and structural analysis software (RC)
by: Low, Khai Jer
Published: (2021) -
A bim and construction productivity study on precast concrete installation
by: Cui, Yue
Published: (2014) -
A BIM and construction productivity study on precast concrete installation
by: Sun, Jing Xiang
Published: (2015) -
Integrating BIM with positioning system to develop a precast installation system
by: Zhou, Yitian
Published: (2016) -
A development on the integration of BIM with RFID to improve the precast logistic management and installation system
by: Lee, Bernice Ser Li
Published: (2021)