Applying fuzzy cognitive mapping to improve productivity of tunnel boring machines
Productivity of the Tunnel Boring Machines (TBM) is always a concern when bored tunnelling is used in tunnel construction projects. Low productivity would cause project delays, resulting in inefficient use of resources and unnecessary costs incurred. However, there are no efficient ways to determine...
Saved in:
Main Author: | Ong, Claudia Lin Na |
---|---|
Other Authors: | Zhang Limao |
Format: | Final Year Project |
Language: | English |
Published: |
2019
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/78633 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
Using fuzzy cognitive map to perceive ground settlement in tunnel construction
by: Ng, Yi Fan
Published: (2019) -
Productivity aspects of bored piling operations in Singapore
by: Lee, Hong Keow., et al.
Published: (2009) -
Project management system on piling project (bored-cast-in-place pile)
by: Ng, Lay Hua.
Published: (2009) -
Field measurements and numerical analysis of interaction between closely spaced bored tunnels
by: Chua, Heng Choon
Published: (2016) -
Multi-objective optimization for improved tunneling project management from planning to operation stages
by: Guo, Kai
Published: (2023)