Report on industrial attachment with Jurong Town Corporation
The author was able to participate in infrastructure and structural design, and site supervision at various JTC sites.
Saved in:
Main Author: | Pu, Chwan Chai. |
---|---|
Other Authors: | School of Civil and Structural Engineering |
Format: | Industrial Attachment (IA) |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/8027 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Similar Items
-
Report on industrial attachment with Jurong Consultants Pte Ltd
by: Cheong, Teresa Wen Ling.
Published: (2010) -
EVOLUTION OF JURONG TOWN CORPORATION INDUSTRIAL BUILDINGS
by: LEE CHUN WYE
Published: (2021) -
Industrialization in Singapore - The role of the Jurong Town Corporation in planning and control.
by: Chia, Hiu Chong., et al.
Published: (2008) -
PRIVATISATION OF JURONG TOWN CORPORATION
by: LEONG HONG YEW
Published: (2020) -
Report on industrial attachment with KBR
by: Poo, Sue Xin.
Published: (2009)