Final report for industrial attachment with Ching Soon Construction Pte Ltd
The main objective of this attachment with Ching Soon Construction Pte. Ltd. are to gain the first hand experience in piling profession and to apply the acquired knowledge in piled foundation design and analysis.
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/5149 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |