Final report for industrial attachment with Ching Soon Construction Pte Ltd

The main objective of this attachment with Ching Soon Construction Pte. Ltd. are to gain the first hand experience in piling profession and to apply the acquired knowledge in piled foundation design and analysis.

Saved in:
Bibliographic Details
Main Author: Chua, Heng Choon.
Other Authors: Ashraf Mohammmad Hefny
Format: Industrial Attachment (IA)
Published: 2008
Subjects:
Online Access:http://hdl.handle.net/10356/5149
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
id sg-ntu-dr.10356-5149
record_format dspace
spelling sg-ntu-dr.10356-51492023-03-03T16:52:24Z Final report for industrial attachment with Ching Soon Construction Pte Ltd Chua, Heng Choon. Ashraf Mohammmad Hefny School of Civil and Environmental Engineering DRNTU::Engineering::Civil engineering The main objective of this attachment with Ching Soon Construction Pte. Ltd. are to gain the first hand experience in piling profession and to apply the acquired knowledge in piled foundation design and analysis. 2008-09-17T10:28:40Z 2008-09-17T10:28:40Z 2002 2002 Industrial Attachment (IA) http://hdl.handle.net/10356/5149 Nanyang Technological University application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
topic DRNTU::Engineering::Civil engineering
spellingShingle DRNTU::Engineering::Civil engineering
Chua, Heng Choon.
Final report for industrial attachment with Ching Soon Construction Pte Ltd
description The main objective of this attachment with Ching Soon Construction Pte. Ltd. are to gain the first hand experience in piling profession and to apply the acquired knowledge in piled foundation design and analysis.
author2 Ashraf Mohammmad Hefny
author_facet Ashraf Mohammmad Hefny
Chua, Heng Choon.
format Industrial Attachment (IA)
author Chua, Heng Choon.
author_sort Chua, Heng Choon.
title Final report for industrial attachment with Ching Soon Construction Pte Ltd
title_short Final report for industrial attachment with Ching Soon Construction Pte Ltd
title_full Final report for industrial attachment with Ching Soon Construction Pte Ltd
title_fullStr Final report for industrial attachment with Ching Soon Construction Pte Ltd
title_full_unstemmed Final report for industrial attachment with Ching Soon Construction Pte Ltd
title_sort final report for industrial attachment with ching soon construction pte ltd
publishDate 2008
url http://hdl.handle.net/10356/5149
_version_ 1759856619370315776