Final report for industrial attachment with Ching Soon Construction Pte Ltd
The main objective of this attachment with Ching Soon Construction Pte. Ltd. are to gain the first hand experience in piling profession and to apply the acquired knowledge in piled foundation design and analysis.
Saved in:
Main Author: | Chua, Heng Choon. |
---|---|
Other Authors: | Ashraf Mohammmad Hefny |
Format: | Industrial Attachment (IA) |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/5149 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Similar Items
Industrial attachment report with Infineum (Singapore) Pte Ltd.
by: Chia, Wei Xin.
Published: (2011)
by: Chia, Wei Xin.
Published: (2011)
Similar Items
-
Student industrial attachment report with Greatearth Construction Pte Ltd (Visioncrest Project)
by: Yap, Swee Fong.
Published: (2008) -
Final report on industrial attachment with Sharp Electronics (S) Pte Ltd
by: Koay, Hean Koon.
Published: (2008) -
Report on industrial attachment with Sanchoon Builders Pte Ltd
by: Chan, Sau Choy.
Published: (2008) -
Report on industrial attachment with Future Builder Pte Ltd
by: Chian, Siau Chen.
Published: (2008) -
Report on industrial attachment with VSL Singapore Pte Ltd
by: Koh, Chian Meng.
Published: (2008)