Solving of the economic lot scheduling problem using a power of two based policy
In this project, we propose an algorithm that starts with the Common Cycle time solution which guarantees feasibility to the schedule generated and then improve upon this solution to minimize the cost of production. The power of two based heuristic policy is used to improve the Common Cycle Time sol...
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | Final Year Project |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/8394 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |