Solving of the economic lot scheduling problem using a power of two based policy

In this project, we propose an algorithm that starts with the Common Cycle time solution which guarantees feasibility to the schedule generated and then improve upon this solution to minimize the cost of production. The power of two based heuristic policy is used to improve the Common Cycle Time sol...

Full description

Saved in:
Bibliographic Details
Main Author: Dhivya Chandrasekaran
Other Authors: Viswanathan, S
Format: Final Year Project
Published: 2008
Subjects:
Online Access:http://hdl.handle.net/10356/8394
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Be the first to leave a comment!
You must be logged in first